Lean projects should be chosen based on ?
All of the Options
The number of people affected by the changes
Impact to the customer and to the company
Anticipated chance for success
Mura means ?
All of the Options
Doesnt add value
Overburden and absurdity
Unevenness (Inconsistency in physical matters)
Place the 5s's in the proper order ?
Shine, Sort, Standardize, Set-in-order, Sustain
Sustain, Set-in-order, Shine, Sort, Standardize
Sort, Set-in-order, Shine, Sustain, Standardize
Sort, Set-in-order, Shine, Standardize, Sustain
The main objective of lean manufacturing is to ?
Produce goods using less resources compared to mass production techniques
Produce products with fewer options to simplify consumer choices
Outsource much of our manufacturing in order to focus on final assembly
Keep labor costs as low as possible by using more of other resources
The 10,000,000,000 dollar spent on material handling equipment has been to a waste of money ?
True
False
What do we mean by VSM ?
Very Serious Mistake
Value Stream Mapping
Valid Sustainable Management
None of the Options
Using kanban, production demand is triggered by ?
The production planner
Forecast
Any of the Options
Removal of product by the downstream customer
5S ?
Is a simple five-step process
Relies on the organization and demarcation of the working areas
Can be done without managerial support
Targets improvements in morale and efficiency
A,C and D
A and D
5S is another word for housekeeping ?
False
True
Lean Thinking should only be implemented when there is no crisis ?
True
False
We can best increase output by producing parts faster ?
False
True
In a lean workcell, the supervisor’s main responsibility is:
Keeping production moving
Keeping workers busy
Identifying and resolving abnormal conditions
Achieving production counts
Lean manufacturing is a ?
Method for reducing labor cost
Set of tools designed to improve productivity
Means to improve responsiveness to the customer
Efficiency improvement technique
Following are the advantages of sticking to the takt time except ?
The system is in synchronization with customer requirement
Production is smoothly planned and operations will be carried out without interruptions
It will give you the rhythm in which the system should operate
Pull scheduling is disabled.
Kanban is based on a model of ?
Automotive assembly lines
Supermarkets
Shipyards
Job shop machining
Which of the following is not one of the eight wastes ?
Transporting
Excess machine capacity
Overproduction
Waiting
It takes two to three years to complete Lean Manufacturing implementation ?
True
False
In a manufacturing cell, who has authority to stop production?
The material handler
All of the Options
The line supervisor
Machine operators
“Queue” means:
A unit of measure
Material should be pushed to the next operation when a batch is complete
Waiting
A signal to start production ?
One-piece-flow means ?
Larger lot sizes
Operators need to work harder
One piece moves to the next operation
Batch
Defective product should be ?
Immediately moved to the quality holding area
Moved to the rework process
Displayed for everyone to see
Scrapped or repaired immediately.
Products with low demand should be ?
Produced in the quantity needed
Assigned higher cost per unit
Assigned higher cost per unit
Batch processed and held in stock until needed
In a cell, the operators are responsible to ?
Run the machines or processes assigned
Direct requests to the supervisor
Maximize production output
Meet customer requirements
Production line problems should be apparent to even a casual observer ?
False
True
Which of the following is not a goal of lean manufacturing ?
Producing smaller lot sizes
Utilizing activity-based costing
Increasing machine utilization
Reducing set-up times