SimulationsX
  • Home
  • Simulations
  • How it works
  • Quiz
0     

SIMULATIONSX

XPERIENTIAL NATURE OF OUR SIMULATIONS ENABLE THE DELEGATES TO LEARN BY DOING!



LEAN

Which of the following is not one of the eight wastes ?

 Waiting
 Excess machine capacity
 Transporting
 Overproduction

In a cell, the operators are responsible to ?

 Run the machines or processes assigned
 Meet customer requirements
 Direct requests to the supervisor
 Maximize production output

5S ?

 A and D
 Relies on the organization and demarcation of the working areas
 Targets improvements in morale and efficiency
 Is a simple five-step process
 A,C and D
 Can be done without managerial support

In a manufacturing cell, who has authority to stop production?

 All of the Options
 The material handler
 The line supervisor
 Machine operators

“Queue” means:

 Waiting
 Material should be pushed to the next operation when a batch is complete
 A unit of measure
 A signal to start production ?

Kanban is based on a model of ?

 Automotive assembly lines
 Shipyards
 Job shop machining
 Supermarkets

Defective product should be ?

 Displayed for everyone to see
 Immediately moved to the quality holding area
 Moved to the rework process
 Scrapped or repaired immediately.

Production line problems should be apparent to even a casual observer ?

 True
 False

What do we mean by VSM ?

 Valid Sustainable Management
 None of the Options
 Very Serious Mistake
 Value Stream Mapping

The 10,000,000,000 dollar spent on material handling equipment has been to a waste of money ?

 True
 False

5S is another word for housekeeping ?

 False
 True

It takes two to three years to complete Lean Manufacturing implementation ?

 True
 False

Lean projects should be chosen based on ?

 All of the Options
 The number of people affected by the changes
 Anticipated chance for success
 Impact to the customer and to the company

One-piece-flow means ?

 Batch
 One piece moves to the next operation
 Operators need to work harder
 Larger lot sizes

Which of the following is not a goal of lean manufacturing ?

 Reducing set-up times
 Producing smaller lot sizes
 Utilizing activity-based costing
 Increasing machine utilization

Place the 5s's in the proper order ?

 Sustain, Set-in-order, Shine, Sort, Standardize
 Sort, Set-in-order, Shine, Sustain, Standardize
 Shine, Sort, Standardize, Set-in-order, Sustain
 Sort, Set-in-order, Shine, Standardize, Sustain

We can best increase output by producing parts faster ?

 False
 True

Lean Thinking should only be implemented when there is no crisis ?

 False
 True

Lean manufacturing is a ?

 Method for reducing labor cost
 Efficiency improvement technique
 Means to improve responsiveness to the customer
 Set of tools designed to improve productivity

The main objective of lean manufacturing is to ?

 Produce products with fewer options to simplify consumer choices
 Outsource much of our manufacturing in order to focus on final assembly
 Keep labor costs as low as possible by using more of other resources
 Produce goods using less resources compared to mass production techniques

Following are the advantages of sticking to the takt time except ?

 The system is in synchronization with customer requirement
 Pull scheduling is disabled.
 Production is smoothly planned and operations will be carried out without interruptions
 It will give you the rhythm in which the system should operate

In a lean workcell, the supervisor’s main responsibility is:

 Keeping workers busy
 Achieving production counts
 Identifying and resolving abnormal conditions
 Keeping production moving

Products with low demand should be ?

 Assigned higher cost per unit
 Batch processed and held in stock until needed
 Produced in the quantity needed
 Assigned higher cost per unit

Using kanban, production demand is triggered by ?

 The production planner
 Any of the Options
 Removal of product by the downstream customer
 Forecast

Mura means ?

 Doesnt add value
 Unevenness (Inconsistency in physical matters)
 Overburden and absurdity
 All of the Options





Quiz Results

Resources
  • Home
  • Simulations
  • How it works
  • Archive
Information

+92 333 239-9005

info@simulationsx.com



© 2025 Simulations Xperience Pvt. Ltd.
Privacy Policy and Terms & Conditions