SimulationsX
Home
Simulations
How it works
Quiz
0
SIMULATIONSX
XPERIENTIAL NATURE OF OUR SIMULATIONS ENABLE THE DELEGATES TO LEARN BY DOING!
LEAN
Defective product should be ?
Scrapped or repaired immediately.
Displayed for everyone to see
Immediately moved to the quality holding area
Moved to the rework process
5S ?
Targets improvements in morale and efficiency
A,C and D
Is a simple five-step process
Can be done without managerial support
A and D
Relies on the organization and demarcation of the working areas
Following are the advantages of sticking to the takt time except ?
Pull scheduling is disabled.
Production is smoothly planned and operations will be carried out without interruptions
It will give you the rhythm in which the system should operate
The system is in synchronization with customer requirement
Lean projects should be chosen based on ?
Anticipated chance for success
All of the Options
Impact to the customer and to the company
The number of people affected by the changes
One-piece-flow means ?
Larger lot sizes
Batch
Operators need to work harder
One piece moves to the next operation
It takes two to three years to complete Lean Manufacturing implementation ?
False
True
Which of the following is not a goal of lean manufacturing ?
Producing smaller lot sizes
Increasing machine utilization
Utilizing activity-based costing
Reducing set-up times
Production line problems should be apparent to even a casual observer ?
False
True
In a manufacturing cell, who has authority to stop production?
Machine operators
The material handler
All of the Options
The line supervisor
Products with low demand should be ?
Assigned higher cost per unit
Assigned higher cost per unit
Produced in the quantity needed
Batch processed and held in stock until needed
What do we mean by VSM ?
None of the Options
Value Stream Mapping
Very Serious Mistake
Valid Sustainable Management
“Queue” means:
Material should be pushed to the next operation when a batch is complete
Waiting
A unit of measure
A signal to start production ?
Using kanban, production demand is triggered by ?
The production planner
Forecast
Removal of product by the downstream customer
Any of the Options
5S is another word for housekeeping ?
False
True
Lean Thinking should only be implemented when there is no crisis ?
False
True
In a cell, the operators are responsible to ?
Maximize production output
Meet customer requirements
Direct requests to the supervisor
Run the machines or processes assigned
The main objective of lean manufacturing is to ?
Outsource much of our manufacturing in order to focus on final assembly
Produce goods using less resources compared to mass production techniques
Keep labor costs as low as possible by using more of other resources
Produce products with fewer options to simplify consumer choices
In a lean workcell, the supervisor’s main responsibility is:
Achieving production counts
Identifying and resolving abnormal conditions
Keeping workers busy
Keeping production moving
We can best increase output by producing parts faster ?
False
True
Kanban is based on a model of ?
Automotive assembly lines
Shipyards
Supermarkets
Job shop machining
The 10,000,000,000 dollar spent on material handling equipment has been to a waste of money ?
False
True
Mura means ?
All of the Options
Unevenness (Inconsistency in physical matters)
Doesnt add value
Overburden and absurdity
Place the 5s's in the proper order ?
Sort, Set-in-order, Shine, Sustain, Standardize
Sustain, Set-in-order, Shine, Sort, Standardize
Shine, Sort, Standardize, Set-in-order, Sustain
Sort, Set-in-order, Shine, Standardize, Sustain
Lean manufacturing is a ?
Efficiency improvement technique
Method for reducing labor cost
Means to improve responsiveness to the customer
Set of tools designed to improve productivity
Which of the following is not one of the eight wastes ?
Overproduction
Waiting
Excess machine capacity
Transporting
Quiz Results
Back to Quizzes