In a lean workcell, the supervisor’s main responsibility is:
Keeping production moving
Achieving production counts
Keeping workers busy
Identifying and resolving abnormal conditions
In a manufacturing cell, who has authority to stop production?
Machine operators
The line supervisor
The material handler
All of the Options
Kanban is based on a model of ?
Shipyards
Job shop machining
Supermarkets
Automotive assembly lines
Using kanban, production demand is triggered by ?
Removal of product by the downstream customer
The production planner
Any of the Options
Forecast
Production line problems should be apparent to even a casual observer ?
False
True
5S is another word for housekeeping ?
True
False
“Queue” means:
A signal to start production ?
A unit of measure
Waiting
Material should be pushed to the next operation when a batch is complete
Place the 5s's in the proper order ?
Shine, Sort, Standardize, Set-in-order, Sustain
Sort, Set-in-order, Shine, Standardize, Sustain
Sustain, Set-in-order, Shine, Sort, Standardize
Sort, Set-in-order, Shine, Sustain, Standardize
5S ?
A and D
Targets improvements in morale and efficiency
Relies on the organization and demarcation of the working areas
Can be done without managerial support
A,C and D
Is a simple five-step process
Lean manufacturing is a ?
Means to improve responsiveness to the customer
Method for reducing labor cost
Efficiency improvement technique
Set of tools designed to improve productivity
Following are the advantages of sticking to the takt time except ?
The system is in synchronization with customer requirement
Pull scheduling is disabled.
It will give you the rhythm in which the system should operate
Production is smoothly planned and operations will be carried out without interruptions
In a cell, the operators are responsible to ?
Meet customer requirements
Run the machines or processes assigned
Direct requests to the supervisor
Maximize production output
Lean Thinking should only be implemented when there is no crisis ?
False
True
Mura means ?
Overburden and absurdity
Doesnt add value
All of the Options
Unevenness (Inconsistency in physical matters)
It takes two to three years to complete Lean Manufacturing implementation ?
False
True
We can best increase output by producing parts faster ?
True
False
Defective product should be ?
Immediately moved to the quality holding area
Moved to the rework process
Scrapped or repaired immediately.
Displayed for everyone to see
Which of the following is not a goal of lean manufacturing ?
Increasing machine utilization
Reducing set-up times
Producing smaller lot sizes
Utilizing activity-based costing
The 10,000,000,000 dollar spent on material handling equipment has been to a waste of money ?
True
False
Lean projects should be chosen based on ?
Impact to the customer and to the company
All of the Options
Anticipated chance for success
The number of people affected by the changes
The main objective of lean manufacturing is to ?
Produce products with fewer options to simplify consumer choices
Produce goods using less resources compared to mass production techniques
Outsource much of our manufacturing in order to focus on final assembly
Keep labor costs as low as possible by using more of other resources
Which of the following is not one of the eight wastes ?
Transporting
Waiting
Overproduction
Excess machine capacity
One-piece-flow means ?
One piece moves to the next operation
Operators need to work harder
Batch
Larger lot sizes
Products with low demand should be ?
Assigned higher cost per unit
Produced in the quantity needed
Batch processed and held in stock until needed
Assigned higher cost per unit
What do we mean by VSM ?
Very Serious Mistake
Valid Sustainable Management
Value Stream Mapping
None of the Options