LEAN
Production line problems should be apparent to even a casual observer ?
False
True
Following are the advantages of sticking to the takt time except ?
It will give you the rhythm in which the system should operate
Pull scheduling is disabled.
Production is smoothly planned and operations will be carried out without interruptions
The system is in synchronization with customer requirement
Which of the following is not one of the eight wastes ?
Overproduction
Excess machine capacity
Transporting
Waiting
Mura means ?
Doesnt add value
Unevenness (Inconsistency in physical matters)
Overburden and absurdity
All of the Options
Which of the following is not a goal of lean manufacturing ?
Reducing set-up times
Increasing machine utilization
Utilizing activity-based costing
Producing smaller lot sizes
Lean manufacturing is a ?
Efficiency improvement technique
Set of tools designed to improve productivity
Method for reducing labor cost
Means to improve responsiveness to the customer
Lean projects should be chosen based on ?
The number of people affected by the changes
Anticipated chance for success
All of the Options
Impact to the customer and to the company
The 10,000,000,000 dollar spent on material handling equipment has been to a waste of money ?
False
True
The main objective of lean manufacturing is to ?
Outsource much of our manufacturing in order to focus on final assembly
Produce products with fewer options to simplify consumer choices
Keep labor costs as low as possible by using more of other resources
Produce goods using less resources compared to mass production techniques
Lean Thinking should only be implemented when there is no crisis ?
False
True
It takes two to three years to complete Lean Manufacturing implementation ?
False
True
Products with low demand should be ?
Assigned higher cost per unit
Assigned higher cost per unit
Batch processed and held in stock until needed
Produced in the quantity needed
5S is another word for housekeeping ?
True
False
Using kanban, production demand is triggered by ?
The production planner
Removal of product by the downstream customer
Forecast
Any of the Options
What do we mean by VSM ?
Valid Sustainable Management
Value Stream Mapping
Very Serious Mistake
None of the Options
In a cell, the operators are responsible to ?
Meet customer requirements
Run the machines or processes assigned
Direct requests to the supervisor
Maximize production output
Place the 5s's in the proper order ?
Sustain, Set-in-order, Shine, Sort, Standardize
Sort, Set-in-order, Shine, Sustain, Standardize
Sort, Set-in-order, Shine, Standardize, Sustain
Shine, Sort, Standardize, Set-in-order, Sustain
“Queue” means:
A signal to start production ?
Waiting
A unit of measure
Material should be pushed to the next operation when a batch is complete
In a manufacturing cell, who has authority to stop production?
The material handler
Machine operators
All of the Options
The line supervisor
One-piece-flow means ?
Operators need to work harder
Batch
One piece moves to the next operation
Larger lot sizes
We can best increase output by producing parts faster ?
True
False
In a lean workcell, the supervisor’s main responsibility is:
Keeping workers busy
Identifying and resolving abnormal conditions
Keeping production moving
Achieving production counts
5S ?
Relies on the organization and demarcation of the working areas
A,C and D
Can be done without managerial support
Is a simple five-step process
Targets improvements in morale and efficiency
A and D
Defective product should be ?
Displayed for everyone to see
Scrapped or repaired immediately.
Immediately moved to the quality holding area
Moved to the rework process
Kanban is based on a model of ?
Shipyards
Job shop machining
Automotive assembly lines
Supermarkets
Quiz Results
Back to Quizzes