SimulationsX
Home
Simulations
How it works
Quiz
0
SIMULATIONSX
XPERIENTIAL NATURE OF OUR SIMULATIONS ENABLE THE DELEGATES TO LEARN BY DOING!
SIX SIGMA
Which of the following is/are a Logical, Related, Sequential (Connected) set of Activities(s) and Tasks that takes an Input from a Supplier, add(s) Values to it, and produces an Output that goes to Customer.
Activity
Task
All the Options
Process
The Central Limit Theorem states that the distribution of Sample Means approximates a Normal Distribution if;
The Sample is Normally Distributed
The Sample Size is sufficiently Large.
The Population is Normally Distributed
The Sample is randomly Selected
What is the relationship between Bias & Linearity?
Both options (A) & (B)
None of the Options.
Linearity is a special case of Bias
Bias is the Measure of inaccuracy at a point. Linearity is an evaluation of the Bias at several Poin
In a mature Six Sigma program?
The Quality & HR Department is the key Customer contact.
Only a small percentage of the employees are involved, and only for limited times.
There is not much left to be gained by Six Sigma Projects
Nearly everyone in the organization is involved in some way at some time
The Kano Model is interpreted as Follows?
Customers will be satisfied if you supply them with Products and Services that meet their needs at a fair price.
Customer Wants, Needs, and Expectations are dynamic and must be monitored continuously. Providing Products or Services that match the Customer’s Expectations is not enough to assure Customer Satisfaction.
Customer Satisfaction is determined solely by the quantity of the Product or Service delivered
Customer wants can be determined once and for all and used to design high-quality Products and Services.
A Firm manufactures a certain industrial component that has a length which is approximately normally distributed, with the Mean equal to 800 and a Standard Deviation of 40. Test the Hypothesis (H0 : Mean=800 vs. H1 : Mean≠800) if a Random Sample of 20 Parts has an Average length of 788. ά is 10 %.
H1 is Correct
None of the Options
H0 is 800 is Correct
The length of Machine Part is known to have a Normal Distribution with a Mean of 100mm and Standard Deviation of 2mm. What Proportion of the Parts will be in between 99.5 and 102.5mm?
0.42
0.0850
0.0401
0.0495
A Six Sigma Level of Quality?
Equates to a Capability Index of 1.33
Implies 99.73% of the output will meet Customer Requirements.
Represents 3.4 Defects per Million Opportunities
Provides half the Defects of a 3 Sigma Level of Quality.
A type of Line graph used to assess the Stability of a Process is called?
Control Chart
Scatter Diagram
Pareto Chart
Run Chart
In a Process FMEA, Process and/or Design changes can?
Reduce the Probability of Occurrence
Increase the Probability of Detection.
Reduce the Severity Raking.
All the Options.
The Number of employees at five different superstores are 3, 5, 6, 4, and 6. Treating the Data as a Population, find the Mean Number of Employees for the 5 Stores:
3.8
4.8
2
3
To Break down a large project into smaller, more manageable projects, a black belt should use?
An Analytical Hierarchy diagram
A Work Breakdown Structure
A Flow Chart
An Activity Network Diagram
Failure Mode & Effect Analysis involves what activity?
The study of how a product fails and what causes the failure
A study of the probability of success in a given time period
The expected number of failure in a given time interval
The determination of the probability of failure in a specified period of time
In Project Charter, the actual measure of the Defect or Error in the Process is?
Problem Statement
Business Case
Primary Metric
Secondary Metric
In a SIPOC Analysis, Outputs include?
Results; Value-added Products or Services, resources.
Results; Value-added Products or Services.
Results; Value-added Products /Services, Payments, Documentation, Input to other Processes
Data
Evaluating Customer Complaints allows an organization to?
Exercise recovery skills to win back Customers loyalty
None of the Options.
Prevent Problems
Focus on all the issues that cause problems
A leader in the Quality Movement who recommended that organizations “Eliminate numerical quotas for the work force and Numerical Goals for Management” :
Crosby
Ishikawa
Juran
None of the Options
Why do we need Control Plan? Answer is/are?
All the Options.
It helps to produce Consistent and Predictable Quality.
It communicates what do we have to Check and Control throughout the Process.
It helps new people to understand the Process and its Control Steps.
In general, if %GRR is Greater than 30%, the Measurement System is considered?
Marginal
Acceptable
No information
Inadequate
Quiz Results
Back to Quizzes