SimulationsX
  • Home
  • Simulations
  • How it works
  • Quiz
0     

SIMULATIONSX

XPERIENTIAL NATURE OF OUR SIMULATIONS ENABLE THE DELEGATES TO LEARN BY DOING!



SIX SIGMA

Why do we need Control Plan? Answer is/are?

 All the Options.
 It helps to produce Consistent and Predictable Quality.
 It helps new people to understand the Process and its Control Steps.
 It communicates what do we have to Check and Control throughout the Process.

Failure Mode & Effect Analysis involves what activity?

 The determination of the probability of failure in a specified period of time
 The expected number of failure in a given time interval
 The study of how a product fails and what causes the failure
 A study of the probability of success in a given time period

Which of the following is/are a Logical, Related, Sequential (Connected) set of Activities(s) and Tasks that takes an Input from a Supplier, add(s) Values to it, and produces an Output that goes to Customer.

 All the Options
 Activity
 Process
 Task

A type of Line graph used to assess the Stability of a Process is called?

 Control Chart
 Pareto Chart
 Run Chart
 Scatter Diagram

In a Process FMEA, Process and/or Design changes can?

 Reduce the Severity Raking.
 All the Options.
 Increase the Probability of Detection.
 Reduce the Probability of Occurrence

In general, if %GRR is Greater than 30%, the Measurement System is considered?

 No information
 Inadequate
 Acceptable
 Marginal

To Break down a large project into smaller, more manageable projects, a black belt should use?

 A Work Breakdown Structure
 An Activity Network Diagram
 A Flow Chart
 An Analytical Hierarchy diagram

The Number of employees at five different superstores are 3, 5, 6, 4, and 6. Treating the Data as a Population, find the Mean Number of Employees for the 5 Stores:

 2
 3.8
 4.8
 3

Evaluating Customer Complaints allows an organization to?

 Focus on all the issues that cause problems
 Prevent Problems
 None of the Options.
 Exercise recovery skills to win back Customers loyalty

The Central Limit Theorem states that the distribution of Sample Means approximates a Normal Distribution if;

 The Sample Size is sufficiently Large.
 The Sample is Normally Distributed
 The Sample is randomly Selected
 The Population is Normally Distributed

The length of Machine Part is known to have a Normal Distribution with a Mean of 100mm and Standard Deviation of 2mm. What Proportion of the Parts will be in between 99.5 and 102.5mm?

 0.0850
 0.0401
 0.0495
 0.42

A Firm manufactures a certain industrial component that has a length which is approximately normally distributed, with the Mean equal to 800 and a Standard Deviation of 40. Test the Hypothesis (H0 : Mean=800 vs. H1 : Mean≠800) if a Random Sample of 20 Parts has an Average length of 788. ά is 10 %.

 H0 is 800 is Correct
 None of the Options
 H1 is Correct

In a mature Six Sigma program?

 There is not much left to be gained by Six Sigma Projects
 The Quality & HR Department is the key Customer contact.
 Nearly everyone in the organization is involved in some way at some time
 Only a small percentage of the employees are involved, and only for limited times.

The Kano Model is interpreted as Follows?

 Customer Satisfaction is determined solely by the quantity of the Product or Service delivered
 Customers will be satisfied if you supply them with Products and Services that meet their needs at a fair price.
 Customer Wants, Needs, and Expectations are dynamic and must be monitored continuously. Providing Products or Services that match the Customer’s Expectations is not enough to assure Customer Satisfaction.
 Customer wants can be determined once and for all and used to design high-quality Products and Services.

In a SIPOC Analysis, Outputs include?

 Results; Value-added Products or Services.
 Data
 Results; Value-added Products or Services, resources.
 Results; Value-added Products /Services, Payments, Documentation, Input to other Processes

In Project Charter, the actual measure of the Defect or Error in the Process is?

 Secondary Metric
 Business Case
 Primary Metric
 Problem Statement

What is the relationship between Bias & Linearity?

 Linearity is a special case of Bias
 None of the Options.
 Both options (A) & (B)
 Bias is the Measure of inaccuracy at a point. Linearity is an evaluation of the Bias at several Poin

A leader in the Quality Movement who recommended that organizations “Eliminate numerical quotas for the work force and Numerical Goals for Management” :

 Crosby
 Juran
 Ishikawa
 None of the Options

A Six Sigma Level of Quality?

 Provides half the Defects of a 3 Sigma Level of Quality.
 Represents 3.4 Defects per Million Opportunities
 Implies 99.73% of the output will meet Customer Requirements.
 Equates to a Capability Index of 1.33





Quiz Results

Resources
  • Home
  • Simulations
  • How it works
  • Archive
Information

+92 333 239-9005

info@simulationsx.com



© 2025 Simulations Xperience Pvt. Ltd.
Privacy Policy and Terms & Conditions