Failure Mode & Effect Analysis involves what activity?
The determination of the probability of failure in a specified period of time
The expected number of failure in a given time interval
The study of how a product fails and what causes the failure
A study of the probability of success in a given time period
The length of Machine Part is known to have a Normal Distribution with a Mean of 100mm and Standard Deviation of 2mm. What Proportion of the Parts will be in between 99.5 and 102.5mm?
0.0850
0.0495
0.0401
0.42
In a SIPOC Analysis, Outputs include?
Results; Value-added Products or Services.
Results; Value-added Products or Services, resources.
Results; Value-added Products /Services, Payments, Documentation, Input to other Processes
Data
The Kano Model is interpreted as Follows?
Customer Wants, Needs, and Expectations are dynamic and must be monitored continuously. Providing Products or Services that match the Customer’s Expectations is not enough to assure Customer Satisfaction.
Customer wants can be determined once and for all and used to design high-quality Products and Services.
Customer Satisfaction is determined solely by the quantity of the Product or Service delivered
Customers will be satisfied if you supply them with Products and Services that meet their needs at a fair price.
In Project Charter, the actual measure of the Defect or Error in the Process is?
Secondary Metric
Business Case
Problem Statement
Primary Metric
Why do we need Control Plan? Answer is/are?
All the Options.
It helps to produce Consistent and Predictable Quality.
It helps new people to understand the Process and its Control Steps.
It communicates what do we have to Check and Control throughout the Process.
To Break down a large project into smaller, more manageable projects, a black belt should use?
An Analytical Hierarchy diagram
A Flow Chart
An Activity Network Diagram
A Work Breakdown Structure
A type of Line graph used to assess the Stability of a Process is called?
Run Chart
Control Chart
Pareto Chart
Scatter Diagram
What is the relationship between Bias & Linearity?
Both options (A) & (B)
Bias is the Measure of inaccuracy at a point. Linearity is an evaluation of the Bias at several Poin
None of the Options.
Linearity is a special case of Bias
Which of the following is/are a Logical, Related, Sequential (Connected) set of Activities(s) and Tasks that takes an Input from a Supplier, add(s) Values to it, and produces an Output that goes to Customer.
Activity
Task
All the Options
Process
The Central Limit Theorem states that the distribution of Sample Means approximates a Normal Distribution if;
The Population is Normally Distributed
The Sample is Normally Distributed
The Sample Size is sufficiently Large.
The Sample is randomly Selected
In general, if %GRR is Greater than 30%, the Measurement System is considered?
Marginal
Acceptable
No information
Inadequate
A Firm manufactures a certain industrial component that has a length which is approximately normally distributed, with the Mean equal to 800 and a Standard Deviation of 40. Test the Hypothesis (H0 : Mean=800 vs. H1 : Mean≠800) if a Random Sample of 20 Parts has an Average length of 788. ά is 10 %.
None of the Options
H0 is 800 is Correct
H1 is Correct
A leader in the Quality Movement who recommended that organizations “Eliminate numerical quotas for the work force and Numerical Goals for Management” :
None of the Options
Juran
Ishikawa
Crosby
Evaluating Customer Complaints allows an organization to?
Exercise recovery skills to win back Customers loyalty
Prevent Problems
None of the Options.
Focus on all the issues that cause problems
The Number of employees at five different superstores are 3, 5, 6, 4, and 6. Treating the Data as a Population, find the Mean Number of Employees for the 5 Stores:
3
2
4.8
3.8
In a mature Six Sigma program?
Nearly everyone in the organization is involved in some way at some time
The Quality & HR Department is the key Customer contact.
Only a small percentage of the employees are involved, and only for limited times.
There is not much left to be gained by Six Sigma Projects
In a Process FMEA, Process and/or Design changes can?
Reduce the Probability of Occurrence
All the Options.
Reduce the Severity Raking.
Increase the Probability of Detection.
A Six Sigma Level of Quality?
Represents 3.4 Defects per Million Opportunities
Implies 99.73% of the output will meet Customer Requirements.
Equates to a Capability Index of 1.33
Provides half the Defects of a 3 Sigma Level of Quality.